Cold-Storage Investment: A Technical Checklist for Site and Facility Selection
An evidence-led checklist for product scenarios, power, insulation, floors, drainage, loading and permits when selecting a cold-storage facility.
Read article
INSIGHTS & ANALYSIS
We examine industrial, logistics, warehousing, energy, fibre and data-centre decisions through KISBU Group’s project-development perspective.
An evidence-led checklist for product scenarios, power, insulation, floors, drainage, loading and permits when selecting a cold-storage facility.
Read articleA practical guide to translating process, power, water, wastewater, building, logistics and permit needs into an evidence-based manufacturing site brief.
Read article
An official-source overview of the Istanbul North Rail Crossing (INRAIL): an approximately 127 km, double-track, electrified and heavy-freight-capable corridor relevant to North Marmara logistics scenarios.
Read article
A practical pre-purchase guide for investors considering industrial land, manufacturing sites or logistics land: planning, utilities, plot geometry and contract checks.
Read article
A practical guide for companies seeking warehouse space in Arnavutköy and Istanbul, comparing existing leases with build-to-suit logistics facilities.
Read article
Industrial investment, infrastructure, scalability and development criteria in the North Marmara Special Industrial Zone.
Read article
Location, truck operations, building efficiency, workforce, power and scalability for Istanbul logistics investment.
Read article
Power, fibre, cooling, security, resilience and scalable site selection for Istanbul data-centre investment.
Read article