Cold-storage selection is more than a comparison of area and location. Product temperature, door traffic, refrigeration load, power continuity, the building envelope and dispatch operations must work as one system.

01

Turn the product scenario into a technical brief

Separate product groups by receiving condition, required storage environment, dwell time, packaging and daily movement. Pre-cooling, chilled and frozen rooms, quarantine, returns and order preparation are distinct flows.

This exposes door cycles, zoning, racking and peak handling demand. Design conditions must be confirmed for the specific product and operation by qualified engineers; no generic temperature value fits every investment.

  • Product group, receiving condition and dwell time
  • Average and peak receipt and dispatch
  • Separated quarantine, returns and cleaning
  • First phase and expansion scenarios
Turn the product scenario into a technical brief
KISBU GROUP · KUZEY MARMARA PROJECT DEVELOPMENT

02

Verify thermal load and electricity demand separately

Compressors, fans, defrost, lighting, chargers, doors and controls have different profiles. Connected, coincident, peak and critical demand should be calculated separately.

Outage tolerance, resilience and restart sequencing belong to the operating model. Supply should be tested through project-specific written conditions from the relevant provider. This is not a capacity or connection guarantee for any plot.

  • Thermal load by room and process
  • Connected, coincident, peak and critical loads
  • Backup power, alarms and controlled shutdown
  • Energy metering and expansion reserve

03

Review envelope, floor and drainage as one system

Panel joints, vapour control, doors, roof and floor details determine thermal bridges and condensation risk. Converting an existing building may require assessment of the structure, floor build-up and plant space, not just new panels.

Floor load, rack bases, joints, frost effects, falls and cleaning water should be designed with operations. Drainage routes need maintenance access and must not compromise hygiene flows.

  • Continuous insulation and vapour control
  • Floor build-up, loading, joints and falls
  • Condensation, icing and door-zone risks
  • Cleaning, drainage and maintenance access

04

Treat the loading yard as part of the cold chain

Vehicle waiting, dock geometry, buffers, door-open time and the route from receipt to room all affect performance.

Truck turning, staff movement, emergency access, waste and service routes should be tested on one plan. Product-specific hygiene segregation must be developed with qualified food-safety specialists.

  • Test hourly peak movements, not dock count alone
  • Separate vehicle, pedestrian, equipment and emergency routes
  • Align buffers, rapid doors and order preparation
  • Define cleaning, pest-control and waste routes

05

Manage permits and investment model through evidence

Fire safety, refrigerant selection, water use, environmental procedures, building and operating approvals vary by project and current law. Screen them with competent authorities and advisers while shortlisting sites.

Use a requirement-criterion-evidence-owner-date matrix to compare leasing an existing building with a purpose-developed facility. KISBU Group conducts land sales, project and business development on its own real estate only; it is not the administration or official website of the North Marmara Special Industrial Zone.

  • Approved plan, formal letter, measurement or specialist report
  • Verified, conditional, open or unsuitable status
  • Operating, maintenance and expansion impacts
  • Authority confirmation of plot, utilities and permits

+

Related investment solutions

Kiralık depo ve lojistik tesis geliştirme çözümüİstanbul lojistik depo yatırımıKiralık depo mu, ihtiyaca özel tesis mi?

+

Sources and verification

T.C. Tarım ve Orman Bakanlığı · Hijyen Esasları ve İyi Uygulama Rehberi · erişim 30 Eylül 2026T.C. Enerji Piyasası Düzenleme Kurumu · Elektrik mevzuatı · erişim 30 Eylül 2026T.C. Çevre, Şehircilik ve İklim Değişikliği Bakanlığı · e-ÇED sistemi · erişim 30 Eylül 2026T.C. Sağlık Bakanlığı · İnsani Tüketim Amaçlı Sular Hakkında Yönetmelik · erişim 30 Eylül 2026