Critical infrastructure determines the site
A data centre is a high-density technology investment built on continuous power and communications. Supply, diverse fibre, backup energy, security and maintenance must be assessed together.

02
Technical readiness checklist
The target Tier and continuity scenario shape land demand and phasing.
- Grid connection and backup power
- Physically diverse fibre routes
- Cooling, climate, water and energy balance
- Fire and physical security
- Ground, seismic, drainage and environmental risk
- Reserved land for modular MW growth
03
The North Marmara investment perspective
Arnavutköy’s access to the airport, Europe and industrial infrastructure warrants detailed technology-investment assessment.
KISBU Group combines power, fibre, architecture, security and operations in one programme.